View this page in ?
🌱 CropWhen
Translate to (Google)

Fertilizer schedule

Eggplant Fertilizer Schedule

Use the stage cards as a planning checklist, then read country notes for local fertilizer language (rates are not prescriptions).

7FAO fert notes
4countries

Stage checklist

Soil preparation
1–3 weeks before sowing/transplant

Work in compost or well-rotted manure; add a balanced basal dressing if soil tests low in P/K.

At planting
Sowing or transplant day

Band a light starter fertilizer near the row; avoid burning young roots with high-salt products.

Vegetative growth
2–4 weeks after establishment

Side-dress with nitrogen for leafy growth if leaves pale; water in thoroughly.

Flowering / fruiting
At flowering / early fruit set

Shift toward potassium and steady moisture for fruiting vegetables (tomato, pepper, cucurbits).

Advertisement

FAO fertilization notes

Excerpts from CropWhen calendar notes that mention fertilizer, manure, NPK, or related terms.

Algeria High West Plains

basal dressing = 40 tde manure / ha, 100 U of N / ha, 150 U P / ha, 200 U K / ha: manure maintenance N = 03 appoorts 40 u / ha each 100 U K / ha 3rd contribution: irrigation = 4000- 6000m3 / ha. (Greenhouse)

Azerbaijan East Slopes

Irrigated. Land preparation with organic manure application. NPK application at the time of land preparation. Direc seedling plantation

Azerbaijan Northwest Coast Plain areas

Irrigated. Direc seedling plantation. Land preparation with organic manure application. NPK application at the time of land preparation.

Azerbaijan South-central Coast Plain areas

Irrigated. Direc seedling plantation under plastic tunnel with plastic cover during 30-40 days at the beginning. Autumn land preparation with organic manure application. NPK application at the time of land preparation.

Azerbaijan South-central Coast Plain areas

Irrigated. Autumn land preparation with organic manure application. NPK application at the time of land preparation. Direc seedling plantation

Burundi Cotnrforts of Mumirwa

The first harvest takes place 160 days after sowing and the last 180 days. generally done planting on hill and marshes ririgation The hill is practiced in dry season (June-September or autajt times as needed). commonly applied organic manure and a little less of NPK.

Cape Verde Semi-arid areas and sub-humid medium-low altitude

Traditional irrigation and drip irrigation. Seedling Nursery with transplant seedlings on the final field 30-40 days after sowing. Organic fertilization during site preparation and mineral covering. It is a culture encors be known by the population.

FAQ: fertilizing Eggplant

When should I fertilize Eggplant?

Follow the stage cards above (soil prep → planting → mid-season). Exact rates depend on soil tests and local packages — FAO notes below show how growers describe fertilization in different countries.

Can I copy NPK numbers from the notes?

Treat them as historical/field guidance, not a prescription for your plot. Units and products differ by country. Confirm with agricultural extension before applying.

Not a fertilizer prescription. Over-application wastes money and can harm plants and waterways. Follow local extension packages.