View this page in ?
🌱 CropWhen
Translate to (Google)

Fertilizer schedule

Pepper Fertilizer Schedule

Use the stage cards as a planning checklist, then read country notes for local fertilizer language (rates are not prescriptions).

9FAO fert notes
5countries

Stage checklist

Soil preparation
1–3 weeks before sowing/transplant

Work in compost or well-rotted manure; add a balanced basal dressing if soil tests low in P/K.

At planting
Sowing or transplant day

Band a light starter fertilizer near the row; avoid burning young roots with high-salt products.

Vegetative growth
2–4 weeks after establishment

Side-dress with nitrogen for leafy growth if leaves pale; water in thoroughly.

Flowering / fruiting
At flowering / early fruit set

Shift toward potassium and steady moisture for fruiting vegetables (tomato, pepper, cucurbits).

Advertisement

FAO fertilization notes

Excerpts from CropWhen calendar notes that mention fertilizer, manure, NPK, or related terms.

Azerbaijan East Slopes

Irrigated. Land preparation with organic manure application. NPK application at the time of land preparation. Direc seedling plantation

Azerbaijan Northwest Coast Plain areas

Irrigated. Direc seedling plantation. Land preparation with organic manure application. NPK application at the time of land preparation.

Azerbaijan South-central Coast Plain areas

Irrigated. Direc seedling plantation under plastic tunnel with plastic cover during 30-40 days at the beginning. Autumn land preparation with organic manure application. NPK application at the time of land preparation.

Azerbaijan South-central Coast Plain areas

Irrigated. Autumn land preparation with organic manure application. NPK application at the time of land preparation. Direc seedling plantation

Cameroon High West plateaux

Requires the nursery. Transplanting after 6 weeks in incubators in holes lined manure décomposé.Labour well into bolts. chemical treatment in case of attack. Applying urea and superphosphate after transplanting to flowering.

Chad Sahelian Zone

Culture begins after the rains. Contribution of composts. The plants are produced in the nursery before being planted.

Chad Sudanian Zone

Culture begins after the rains. Grown on boards with exposed contribution of composts. The plants are produced in the nursery before being planted.

Cote d'Ivoire Guinea Zone

Irrigation. Requires time nursery: 40 - 45 days. Organic fertilizer or NPK applied when the soil preparation. Rest of fertilizer applied 1 month and 2 months after planting. Harvest: maturity; Fruits harvested with their peduncle. Harvest time: 4 months

Timor Leste North Coast Lowland

Rainfed.Irigation Direct seedling. Organic manure is applied at the time of land preparation.

FAQ: fertilizing Pepper

When should I fertilize Pepper?

Follow the stage cards above (soil prep → planting → mid-season). Exact rates depend on soil tests and local packages — FAO notes below show how growers describe fertilization in different countries.

Can I copy NPK numbers from the notes?

Treat them as historical/field guidance, not a prescription for your plot. Units and products differ by country. Confirm with agricultural extension before applying.

Not a fertilizer prescription. Over-application wastes money and can harm plants and waterways. Follow local extension packages.